2016 · Paper V · 10 marksFrequently asked

List-out the projects/activities for which public consultation is not required for issue of prior Environmental Clearance.

In short

Under the EIA Notification 2006 and its amendments, public consultation is not needed for Category B2 projects, irrigation modernisation, units in approved industrial estates, building and township projects, road expansion without new land, biomedical waste facilities and defence projects. A 2019 amendment also exempted oil and gas exploratory drilling.

Model answer

Ghissu Editorial · Verified 4 Oct 2026

Introduction
Public consultation is vital in prior Environmental Clearance (EC), but exemptions exist to reduce delays and support development, notably in Andhra Pradesh where timely clearances are crucial for large infrastructure projects.
Projects and Activities Exempt from Public Consultation
•

Modernisation of Irrigation Projects

Modernisation of existing irrigation projects is exempted, as it involves little fresh land acquisition; major new projects like Polavaram are not, and went through full hearings. Projects in approved industrial estates, building and township projects, road expansion without new land acquisition, and defence and strategic projects are also exempted.

Legal and Regulatory Basis
•

EIA Notification and Amendments

The 2006 Notification and its amendments, such as the COVID-19 re-categorization of bulk drug projects from Category A to B2, legally exempt certain projects from public consultation. These changes aim to balance environmental safeguards with urgent public health and economic needs.

•

Sectoral Incentives

The 2019 amendment exempting onshore and offshore oil and gas exploratory drilling from public consultation encourages exploration despite ecological concerns. This reflects a policy choice to promote energy security while managing environmental risks.

Way Forward
•

Local Engagement and Technology

Incorporating stakeholder inputs in Andhra Pradesh, especially in sensitive zones like the Rayalaseema drought belt, and using virtual consultations can balance efficiency with inclusiveness, ensuring community concerns are addressed even for exempted projects.

Conclusion
Exemptions from public consultation under prior EC, backed by legal frameworks and sectoral needs, facilitate development while safeguarding the environment and communities, particularly in ecologically sensitive areas like Andhra Pradesh. This balanced approach supports sustainable growth without compromising ecological integrity.

This model answer is indicative and the model can make mistakes; please verify key facts independently.

Hand-drawn diagram: Exempt from public consultation. Exempt from public consultation. Diagram (tree): Exempt from public consultation; No public hearing needed; Category B2: small mining, minor industry; Irrigation, buildings, highways; Fertiliser and biomedical waste units; Bulk drugs (COVID-19 period); Exploratory oil and gas drilling
Diagram: Exempt from public consultation

Practise this question

  1. 1Get the answer sheet

    Sized for this question.

  2. 2Write your answer

    Timed, by hand.

  3. 3Get it marked

    Your score and what to fix.

Share this questionWhatsAppTelegramXLinkedIn

This chapter in the exam

Development vs Environment: natural resources, climate change, EIA, natural disasters48 questions

Asked in 8 of 8 sittings since 2008

2008
7
2011
6
2012
5
2016
12
2017
3
2020
5
2023
4
2025
6

Most tested: Climate change and mining/environmental degradation links

All 48 questions, sorted by sub-topic, with model answers and practice.

Question from the official APPSC Group-I Mains 2016 paper. Answer written by Ghissu's engine and checked against our editorial standards. Found an error? Tell us and we correct it within 48 hours.

Ghissu

OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·
OUTWORK·
OUTTHINK·
MASTER THE SYSTEM·